Lenovo 5594-8KX User, Installation And Maintenance Manual page 90

6u rack or tower ups rt 8.0 kva and rt 11.0 kva and maintenance bypass
Hide thumbs Also See for 5594-8KX:
Table of Contents

Advertisement

Chapter 5 Installation
Installation
Unpack the equipment and remove all the packing materials and shipping carton.
Discard or recycle the packaging in a responsible manner, or store it for future use.
Place the cabinet in a protected area that has adequate airflow and is free of humidity,
flammable gas, and corrosion.
Note: Packing materials must be disposed of in compliance with all local regulations concerning
waste. Recycling symbols are printed on the packing materials to facilitate sorting.
Verify that the following additional items are included with the MBP:
Mount the MBP behind the first EBM underneath the UPS Power Module. This applies to both
rack installation or wall installation. See also the section
additional information.
62
MBP I/O cover
MBP I/O "UPS connection" cover
2 conduits with internal wires for UPS
Input/Output connection (4) (4) conduit fittings
Fixation kit for MBP I/O covers (including screws)
Rack kit for 19-inch enclosures
Fixation kit for Rack mounting (including square
nuts and screws)
Tower and wall mounting kit (including 2 ears
and screws)
General MBP installation
6U Rack or Tower UPS RT8kVA and RT11kVA IUOMG
for

Advertisement

Table of Contents
loading

This manual is also suitable for:

5594-8px5594-9kx5594-9px

Table of Contents