Chapter 5 Installation
Installation requirements
Recommended upstream protection
The circuit breaker has to be installed upstream the MBP Normal AC source.
Recommended cable cross-sections
Terminal
position
L1
with
N / L2
8kVA UPS
L1
with
N / L2
11kVA UPS
Copper wire, solid or stranded.
For additional detailed wiring installation see
6U Rack or Tower UPS RT8kVA and RT11kVA IUOMG
Wire
Terminal wire
function
size rating
mm / AWG
Phase
4-25 mm
Neutral / Phase
12-4 AWG
Ground
Phase
4-25 mm
Neutral / Phase
12-4 AWG
Ground
Minimum input wire
size rating
/
10 mm
2
2
16 mm
2
/
16 mm
2
2
25 mm
2
"Chapter 6 Power cables connection
Tightening
torque
Nm / lb-in
(8 AWG) 105°C
2 / 18
(6 AWG) 75°C
(6 AWG) 90°C
2 / 18
(4 AWG) 75°C
".
63