Lenovo 5594-8KX User, Installation And Maintenance Manual page 236

6u rack or tower ups rt 8.0 kva and rt 11.0 kva and maintenance bypass
Hide thumbs Also See for 5594-8KX:
Table of Contents

Advertisement

Chapter 12 Helpful information
TN-C system
The term TN-C comes from the French Terre Neutre Combiné meaning earth neutral combined.
The earthing system shown in
combined in the same wire. Whilst this yields cost reductions it should only be used for
distribution networks rather than IT environments as else this will inevitably lead to problems.
Commonly utility power companies provide the power with 4-poles (L1, L2, L3, PEN). The
separation of the N and PE conductors is not implemented in these earthing systems. The
separation is usually done in close proximity to a Residual Current Circuit Breaker (RCCB).
208
Fig ure 60
is called the TN-C system. Typically, N and PE are
6U Rack or Tower UPS RT8kVA and RT11kVA IUOMG

Advertisement

Table of Contents
loading

This manual is also suitable for:

5594-8px5594-9kx5594-9px

Table of Contents