Lenovo 5594-8KX User, Installation And Maintenance Manual page 117

6u rack or tower ups rt 8.0 kva and rt 11.0 kva and maintenance bypass
Hide thumbs Also See for 5594-8KX:
Table of Contents

Advertisement

Chapter 6 Power cables connection
23. Tighten the cable glands (if used instead of conduit fittings).
Three phase MBP power cables connection
This type of connection must be carried out by qualified electrical personnel.
Attention!
Before carrying out any connection, check that the upstream protection device (Normal
AC source) is open " " (Off).
Before proceeding to connect the HotSwap MBP to the UPS, make sure the UPS has
been properly shut down.
Always connect the ground wire first.
6U Rack or Tower UPS RT8kVA and RT11kVA IUOMG
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

5594-8px5594-9kx5594-9px

Table of Contents