11
Installing the Manifold Supply
Hose
Parts needed for this procedure:
1
Manifold supply hose (1 x 25 inches)
1
Gasket—25 x 35 mm (1 x 1-3/8 inches)
1
Flange clamp—40 to 64 mm (1-9/16 to 2-1/2 inches)
Procedure
Important: If you are installing the conversion valve
kit on a machine with an optional eductor kit, skip this
procedure and complete
and Hoses for the Optional Eductor Kit (page
1. Assemble the straight barbed fitting of the manifold
supply hose to the T-fitting of the sprayer pump
(Figure
60) with the retainer that you removed in step
of
Removing the Agitation Bypass and Sprayer Supply
Hoses (page
17).
12 Installing the Shutoff Valve
29).
5
1. Straight barbed fitting
2. T-fitting (sprayer pump)
3. Gasket—25 x 35 mm (1 x
1-3/8 inches)
4. Flange clamp—40 to
64 mm (1-9/16 to 2-1/2
inches)
2. Secure the barbed flange fitting of the manifold supply
hose and the gasket—25 x 35 mm (1 x 1-3/8 inches)
to the flange of the filter head
clamp—40 to 64 mm (1-9/16 to 2-1/2 inches).
29
Figure 60
5. Retainer
6. Flange (filter head)
7. Barbed flange fitting
8. Manifold supply hose (1 x
25 inches)
(Figure
60) with a flange