Siemens SINAMICS G130 Operating Instructions Manual page 130

Converter built-in units 75 kw-800 kw
Hide thumbs Also See for SINAMICS G130:
Table of Contents

Advertisement

Commissioning
5.3 Procedure for commissioning via STARTER
Accessing the STARTER project wizard
Figure 5-2
Main screen of the STARTER parameterization and commissioning tool
⇒ Hide STARTER Getting Started commissioning drive using HTML Help > Close
The online help can be permanently hidden by deselecting Options > Settings > Workbench
> Display "Getting Started" when starting
Note
Project wizard
When you deactivate the Display wizard during start checkbox, the project wizard is no
longer displayed the next time you start STARTER.
You can call up the project wizard by choosing Project > New with Wizard.
The online help can be opened again at any time using Tools > Settings > Workbench >
Display "Getting Started" when starting
STARTER features a detailed online help function.
130