Electrical Installation - Siemens SINAMICS G130 Operating Instructions Manual

Converter built-in units 75 kw-800 kw
Hide thumbs Also See for SINAMICS G130:
Table of Contents

Advertisement

Electrical installation

4.1
Chapter content
This chapter provides information on the following:
● Establishing the electrical connections for the Power Module, the CU320-2 Control Unit,
and the optional TM31 Terminal Module and SMC30 Sensor Module.
● Adjusting the fan voltage and the internal power supply in line with local conditions
(supply voltage)
● The interfaces for the CU320-2 Control Unit, TM31 Terminal Module, and SMC30 Sensor
Module.
4.2
Preparation
Required tools
You require the following tools for the electrical installation:
● Standard set of tools with screwdrivers, screw wrenches, socket wrenches, etc.
● Torque wrenches 1.5 Nm up to 100 Nm
● 600 mm extension for socket wrenches
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A
4
47

Advertisement

Table of Contents
loading

Table of Contents