FusionModule1000A40 IT Solution
Maintenance Guide (2016.05, AI Version)
Figure 5-19 Installing a LAN switch
Step 6 Reconnect all cables.
Step 7 Connect the power plug of the LAN switch.
Step 8 Check that the new LAN switch is working properly.
----End
Follow-up Procedure
Dispose of the removed LAN switch that is confirmed faulty.
5.3.6 Replacing the ECC500 Collector
Prerequisites
Impact on the System
The monitoring of the corresponding area is interrupted.
Preparations
Tools: cable cutter, Phillips screwdriver, small-sized flat-head screwdriver, insulation tape,
marker
Materials: spare ECC500 collector
Issue 04 (2018-01-05)
If the PWR1, PWR2, and SYS indicators of the LAN switch are on after power-on, the LAN switch is
working properly.
An ECC500 collector needs to be replaced.
A spare ECC500 collector of the same model is available and functional.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Components Replacement
93