Mitsubishi Electric MELSEC Q Series Programming Manual page 343

Motion controller, real mode
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

6 POSITIONING CONTROL
When a skip is specified during constant-speed control and the axis which has no stroke range
[degree] is included, the operation at the execution of skip is described.
(Note-1): If there is an ABS instruction after the skip in these conditions, the end positioning
point and the travel distance in the program as a whole will be the same regardless
of whether the skip is executed or not.
(1) All instructions after the skip are INC instructions:
Program example
CPSTART1
Axis
1
Speed
INC-1
Axis
1,
Skip
INC-1
Axis
1,
INC-1
Axis
1,
CPEND
(2) Instruction immediately after the skip is ABS instruction:
Program example
CPSTART1
Axis
1
Speed
INC-1
Axis
1,
Skip
ABS-1
Axis
1,
INC-1
Axis
1,
CPEND
(3) Instruction immediately after the skip is INC instruction and there is ABS instruction after
that:
Program example
CPSTART1
Axis
1
Speed
INC-1
Axis
1,
Skip
INC-1
Axis
1,
INC-1
Axis
1,
ABS-1
Axis
1,
CPEND
10.000
180.00000
M100
180.00000
270.00000
10.000
180.00000
M100
350.00000
270.00000
10.000
360.00000
M100
180.00000
180.00000
90.00000
CAUTION
When skip is not executed
0
180
When skip is executed
0
100
When the skip occurs at 100 [degree]
When skip is not executed
0
180
When skip is executed
(The end positioning point is same regardless of whether the skip is
executed or not.)
0
100
When the skip occurs at 100 [degree]
When skip is not executed
0
0
When skip is executed
(The end positioning point is same regardless of whether the skip is
executed or not.)
0
80
260
When the skip occurs
at 80 [degree]
6 - 156
0
270[degree]
280
190[degree]
350
260[degree]
350
260[degree]
90[degree]
180
0
90[degree]
80
This point moves at 370 [degree],
not 10 [degree].

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents