GENERAL PRECAUTIONS REGARDING THE SERVICE
The installation and service shall be done by a qualified service technician.
1. Transportation/Installation
- When transporting/installing the equipment, employ two or more persons and be sure to hold the
positions as shown in the figure.
The equipment is quite heavy and weighs approximately 78.1 kg (172.2 lb.), therefore pay full
attention when handling it.
- Be sure not to hold the movable parts or units (e.g. the control panel, ADU or RADF or DSDF) when
transporting the equipment.
- Be sure to use a dedicated outlet with AC 110 V/15 A, 120 V/12 A, 220 - 240 V/8 A for its power
source.
- The equipment must be grounded for safety.
- Select a suitable place for installation. Avoid excessive heat, high humidity, dust, vibration and
direct sunlight.
- Provide proper ventilation since the equipment emits a slight amount of ozone.
- To insure adequate working space for the copying operation, keep a minimum clearance of 30 cm
(11.8") on the left, 80 cm (32") on the right and 20 cm (7.9") on the rear.
- The equipment shall be installed near the socket outlet and shall be easily accessible.
- Be sure to fix and plug in the power cable securely after the installation so that no one trips over it.
- If the unpacking place and where the equipment is to be installed differ, perform image quality
adjustment (automatic gamma adjustment) according to the temperature and humidity of the place
of installation and the paper to be used.
- When the equipment is used after the option is removed, be sure to install the parts or the covers
which have been taken off so that the inside of the equipment is not exposed.
- Do not lift the machine by the areas in the figure that are shaded when lifting it.