S Chedule; B Ackground A Ctivity; Changing A Background Activity Schedule; Enabling Or Disabling A Scheduled Background Activity - Asus DS300j G2 Series User Manual

Disk array subsystems
Table of Contents

Advertisement

c
b
a
S
hanGInG a
ackGrounD
ctIvIty
cheDule
To change an existing scheduled background activity:
1. Click the Administration tab.
2. Click the Background Activities icon.
The list of background appears.
3. Click the Scheduler button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the Settings button.
5. Make settings changes as required:
• Choose a Start Time from the drop-down menus.
The menus have a 24-hour clock.
• Choose a Recurrence Pattern option, daily, weekly, or monthly.
For the Daily option, enter an interval in the Every field.
For the Weekly option, enter an interval in the Every field and choose one or more days of the week.
For the Monthly option, choose the Day of the Month option or the day of the week option, and choose the day
from the drop-down menu.
• Choose a Start From date from the drop-down menus.
• Choose an End On option,
No end date or perpetual.
End after a specific number of activity actions.
Until date from the drop-down menus.
• For Redundancy Check, choose,
Auto Fix option – Attempts to repair the problem when it finds an error. Check to enable
Pause on Error option – The process stops when it finds a non-repairable error. Check to enable
Select LD – Check the boxes for the logical drives to run Redundancy Check. Check at least one logical drive
6. Click the Save button.
74
e
D
S
nablInG or
ISablInG a
cheDuleD
Background activity schedules are enabled by default when you create the schedule. If you want to stop a
background activity now but plan to use it again in the future, disable the scheduled activity rather than deleting
it.
To enable or disable change an existing scheduled background activity:
1. Click the Administration tab.
2. Click the Background Activities icon.
The list of background appears.
3. Click the Scheduler button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the Settings button.
5. Uncheck the Enable This Schedule box to disable this schedule.
Check the box to enable this schedule.
6. Click the Save button.
D
S
b
a
eletInG a
cheDuleD
ackGrounD
To change an existing scheduled background activity:
1. Click the Administration tab.
2. Click the Background Activities icon.
The list of background appears.
3. Click the Scheduler button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the Delete button.
5. In the confirmation box, click the confirm button.
DS300f G2 Series User Manual
b
a
ackGrounD
ctIvIty
ctIvIty

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds300f g2 seriesDs300 g2 series

Table of Contents