Sony BVW-55 Maintenance Manual page 319

Hide thumbs Also See for BVW-55:
Table of Contents

Advertisement

9. Release arm assembly installation
Align the hole and shafts a, b, and c with the pin,
outer slot of cam gear, longitudinal hole of the
eject link assembly, and the longitudinal hole of
the band aligning plate. And then, secure the
release arm assembly with a stop washer.
n
Pull the lever in the direction of the arrow A to
align and insert the shaft b into the longitudinal
hole of the eject link assembly.
10. Tension regulator band installation
Secure the tension regulator band using a new
stop washer.
(Refer to Section 3-9-3.)
11. T tension regulator arm assembly
installation
Secure the T tension regulator arm assembly
using a new stop washer.
(Refer to Section 3-9-4.)
12. Parallel pin removal
Pull the parallel pin out from the S cam gear.
Adjustment after replacement
13. Tape running check
(Refer to Section 5-4.)
14. REV back tension check
(Refer to Section 5-3-2.)
BVW-55 P2
4-13. Cam Gear Assembly Replacement
Stop washer
Release arm assembly
Shaft c
Shaft b
Shaft a
A
Lever
Logitudinal hole
Eject link assembly
Hole
Shaft
Outer slot
Cam gear
assembly
Logitudinal hole
Band aligning
plate assembly
4-47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents