3.7
Load the projects from the drive unit to the PC/PG in ONLINE mode
and save them
Initial commissioning: procedure
In the table below, the current commissioning step is highlighted in bold:
Table 3- 23
1
2
3
4
5
Prerequisite
You are in ONLINE mode in STARTER and have completed the initial commissioning
procedure.
Steps
To store the data configured ONLINE in the STARTER project on the PG/PC, proceed as
follows:
1. In the project navigator, select Drive unit_126. Click the Load to PG function key (see
2. Carry out the following:
3. Click the Disconnect from target system function key.
CANopen interface
Commissioning Manual, (IH2), V2.6, 10/2008 Edition, 6SL3097-2AA00-0BP3

3.7 Load the projects from the drive unit to the PC/PG in ONLINE mode and save them

CANopen initial commissioning
Step
Hardware settings on CBC10 (not for SINAMICS S110)
Configure the drive unit using the STARTER commissioning tool in ONLINE mode.
Configure the COB IDs and process data objects for the receive and transmit message
frames.
Interconnect the receive and transmit buffers.
In ONLINE mode, load the projects from the drive unit to the PC/PG and save.
screenshot below).
Figure 3-30
"Load to PG" function key
– When the system asks "Are you sure?", click Yes. The system now starts loading the
data.
– When the system informs you that the data was successfully loaded, click OK.
Procedure