Commissioning
2.5 Commissioning U/f vector control booksize format for the first time
What?
7
Save the
parameters on the
device
8
The motor starts to
run.
Diagnostic functions in the STARTER commissioning tool
Under Component > Diagnostics > Control/status words
● Control/status words
● Status parameters
● Missing enable signals
108
How?
1. Select the drive unit in the project tree.
2. Call the "Connect target device" shortcut menu.
3. Call the "Target device > Load to target device" shortcut
menu.
The option "After loading, copy RAM to ROM" is active.
Click on "Yes" to confirm backup.
or
4. Call the shortcut menu "Target device > Copy RAM to ROM".
The drives can be started via the control panel in the STARTER
commissioning tool.
Line/DC link identification will be carried out once
the pulses for the infeed have been enabled and line/DC link
identification has been activated. The infeed then switches
into the "Operation" state.
Once the pulses are enabled, a one-off motor data
identification run (if activated) is carried out.
When the pulses are enabled again, optimization with a
rotating motor is carried out, if this is activated.
Commissioning Manual, (IH1), 01/2013, 6SL3097-4AF00-0BP3
Comment
Position cursor on drive
unit (SINAMICS S120) and
right-click.
For more information about
the control panel, see
Getting Started.
During motor data
identification, a current
flows through the motor,
which means that it can
align itself by up to a
quarter of a revolution.
For more information about
line/DC link/motor data
identification, see the
SINAMICS S120 Function
Manual Drive Functions.
Commissioning Manual