Commissioning
2.6 Commissioning the vector control chassis format for the first time
What?
9.
Save the
parameters on the
device
10
The motor starts to
run.
120
How?
1. Select the drive unit in the project tree.
2. Call the "Connect target device" shortcut menu.
3. Call the "Target device > Load to target device" shortcut
menu.
The option "After loading, copy RAM to ROM" is active.
Click on "Yes" to confirm backup.
or
4. Call the shortcut menu "Target device > Copy RAM to ROM".
The drives can be started via the control panel in the STARTER
commissioning tool.
Line/DC link identification will be carried out once the pulses
for the infeed have been enabled and line/DC link
identification has been activated. The infeed then switches
into the "Operation" state.
When the pulses are enabled, a one-off motor data
identification run (if activated) is carried out.
When the pulses are enabled again, optimization with a
rotating motor (if activated) is carried out.
Commissioning Manual, (IH1), 01/2013, 6SL3097-4AF00-0BP3
Comment
Position cursor on drive
unit (SINAMICS S120) and
right-click.
For more information about
the control panel, see
Getting Started.
During motor data
identification, a current
flows through the motor,
which means that it can
align itself by up to a
quarter of a revolution.
For more information about
line/DC link/motor data
identification, see the
SINAMICS S120 Function
Manual Drive Functions.