Preparation for commissioning

1.1 Requirements for commissioning

1.1
Requirements for commissioning
The following are necessary for commissioning a SINAMICS S drive system:
● A programming device (PG/PC)
● STARTER commissioning tool
● A communication interface, e.g. PROFIBUS, PROFINET, Ethernet
● Completely wired-up drive line-up (see the SINAMICS S120 Manual)
The following diagram shows a configuration example with booksize and chassis
components, as well as with PROFIBUS and PROFINET communication:
Figure 1-1
18
Component configuration (example)
Commissioning Manual, (IH1), 01/2013, 6SL3097-4AF00-0BP3