Commissioning
2.3 Creating a project in the STARTER commissioning tool
What?
3.
Insert drives
4.
Summary
5.
Configure the drive
unit
88
How?
The nodes are shown here in the preview.
Use the button "Refresh view" to update the preview.
You have now created the project.
1. Click on "Finish".
Once you have created the project, you have to configure the drive unit. Some examples are