Power ON Procedure and How to Check Power Distribution
Power ON Procedure and How to Check Power
Distribution
1.
Power ON Procedure
1)
Press the ON (POWER) button on the CONTROL PANEL.
This action causes the following to occur.
• The ON (POWER) button on the CONTROL PANEL lights up.
• The MAIN CPU POWER LED in CPU RACK lights up.
Normal status when these are lit
• The Ethernet HUB in CPU RACK turns on.
• The LED of the panel on the LIGHTING CONTROL CONSOLE lights up indicating lighting and
preset operations are enabled.
• The PLAYBACK display turns on and the PLAYBACK screen is displayed.
• The SETTING display turns on and the STAGE screen is displayed.
1-1