17. Install reduction shaft and countershaft together
with R–1 fork shaft and Hi–Lo fork shaft. Insert heads of
shift arms into grooves of forks when installing them.
18. Install main shaft together with 2–3 fork shaft. Insert
head of shift arm into groove of fork while installing.
Drive Train
Page 6 – 46
Figure 104
Figure 105
Figure 106
Figure 107
Workmand 3000 /4000 Series