Power Take–Off (PTO) Reassembly
NOTE: Item numbers in figures are shown in reverse or
der of assembly; for example, when reassembling,
install Item 1 last.
1. Clean gasket material from mating surfaces of case
and cover.
IMPORTANT: Be careful not to damage mating sur
faces when removing gasket material.
2. Make sure all parts should be free of dirt and dust.
3. Assemble shift arm:
A. Install 2 new O–rings (Item 1) onto shift arm. Ap
ply moly disulfide grease to O–rings before instal
ling.
B. Apply moly disulfide grease to arm pin and shaft.
C. Install shift arm into PTO case.
D. Install arm onto shift arm
E. Drive lock pins into arm and shift arm. Pay atten
tion to direction of slit in lock pins.
Drive Train
3
Page 6 – 60
2
1
Figure 148
Figure 149
5
Figure 150
Workman 3000/4000 Series