3.2 Rack Installation
4
5
6
50
Bracket L
Screw holders
M5 screws
(Front rack pillars)
M5 screws
The four M5 screw positions for the brackets and holders are determined relatively to the base line
of controller enclosure.
The M5 screws should be inserted in the 1st and 3rd holes above the base line.
(Front rack pillars)
3rd position
(M5 screws)
1st position
(M5 screws)
Base line of
controller enclosure
Brackets
Tighten the screws that were moved in
Remove the front cover of the controller enclosure.
Refer to
"2.2.3 Attaching and Removing the Front Cover" (page 40)
front cover.
Install the controller enclosure in the rack.
CAUTION
When installing or removing the controller enclosure to or from the
rack, contact your sales representatives or maintenance engineer.
Copyright 2009 FUJITSU LIMITED
Bracket R
Screw holders
Step
2.
Do
ETERNUS2000 disk storage system User Guide
Screw holders
M5 screws
M5 screws
(Rear rack pillars)
Screw holders
(Rear rack pillars)
3rd position
(M5 screws)
1st position
(M5 screws)
Base line of
controller enclosure
Brackets
for procedure to remove the
P3AM-2512-03EN