CONTROL ITEMS
4.8 Maintenance Test
Perform this procedure to measure the link quality of Ethernet traffic. Prior to
proceeding with the Maintenance Test, following should be considered:
NOTES: When performing this Maintenance Test for ETH OAM DM/LM , proceed
with the followings (1 and 2) prior to starting the test:
1. Verify the connectivity in both directions between the equipment to carry out
the test and the target equipment to measure Delay/Loss using the ETH-CC
frames.
2. Execute the Loss Measurement and Delay Measurement with the
Transmission Count value 1 at the equipment to measure Delay/Loss
against the equipment to carry out the test.
Procedure 4-20
1. Click the
2. In the
3. Click the
Figure 4-93 ETH OAM LB/LT/DM/LM Control Window
iPASOLINK EX Advanced: O
Maintenance
system into the Maintenance Mode. The
changes to orange.
MENU
frame on the left, expand the
OAM LB/LT/DM/LM Control
appears.
Modify Test Type
ETH OAM LB/LT/DM/LM Control
& M
PERATION
AINTENANCE
tool button on the tool bar of the
. The
ETH OAM LB/LT/DM/LM Control
tool button, or select the desired Test
Modify Test Type button
Test No.
option window appears.
WebLCT
MAINT
indicator on the tool bar
Maintenance Test
to select
GGS-000548-01E
4-57
to put the
ETH
window
No.