Maintenance Test - NEC iPASOLINK EX Advanced Instruction Manual

71-76/81-86 ghz packet radio system
Table of Contents

Advertisement

CONTROL ITEMS

4.8 Maintenance Test

Perform this procedure to measure the link quality of Ethernet traffic. Prior to
proceeding with the Maintenance Test, following should be considered:
NOTES: When performing this Maintenance Test for ETH OAM DM/LM , proceed
with the followings (1 and 2) prior to starting the test:
1. Verify the connectivity in both directions between the equipment to carry out
the test and the target equipment to measure Delay/Loss using the ETH-CC
frames.
2. Execute the Loss Measurement and Delay Measurement with the
Transmission Count value 1 at the equipment to measure Delay/Loss
against the equipment to carry out the test.
Procedure 4-20
1. Click the
2. In the
3. Click the
Figure 4-93 ETH OAM LB/LT/DM/LM Control Window
iPASOLINK EX Advanced: O
Maintenance
system into the Maintenance Mode. The
changes to orange.
MENU
frame on the left, expand the
OAM LB/LT/DM/LM Control
appears.
Modify Test Type
ETH OAM LB/LT/DM/LM Control
& M
PERATION
AINTENANCE
tool button on the tool bar of the
. The
ETH OAM LB/LT/DM/LM Control
tool button, or select the desired Test
Modify Test Type button
Test No.
option window appears.
WebLCT
MAINT
indicator on the tool bar
Maintenance Test
to select
GGS-000548-01E
4-57
to put the
ETH
window
No.

Advertisement

Table of Contents
loading

Table of Contents