FusionModule2000 Smart Modular Data Center
Installation Guide
Installation
Position
End cabinet
Cabinets at both
sides of a column
(scenarios with a
column)
Figure 10-18 Bottom sealing plates for end cabinets
(1) Side sealing plate
Each of the front and rear sealing plates is assembled by two components. The length after assembly can
be 600 mm or 800 mm.
Issue 02 (2018-03-31)
Type
plates
Front and rear
sealing plates + side
sealing plates
(assembled by five
components)
Front and rear
sealing plates + side
sealing plates
(assembled by five
components)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Installing the Aisle Containment
BOM Number
mm wide air
conditioners.
Available in the
aisle door materials.
21242007
(2) Front or rear sealing plate
Notice
conditioners.
Applies to only end
cabinets.
Applies to only
cabinets at both
sides of a column in
scenarios with a
column.