7.2.3 (Optional) Installing Top Frames (Bottom Pipe Routing)

In the scenario where air conditioner pipes are routed from the bottom, the top frame is
installed in the same way as the top frame of a PDC. For details, see section "Installing a Top
Frame" under "Installing the PDC."
7.3 Installing Air Conditioner Outdoor Units and Routing
Pipes
For details about how to install outdoor units and route pipes, see air conditioner documents
or obtain the required document according to the section "Documentation Preparations."
Issue 02 (2018-03-31)
Use four M8x20 screw assemblies to secure the top frame to the cabinet, as shown by (3)
and (4) in
Figure
7-15.
Install two M5x10 tapping screws at the front of the top frame to set up equipotential
bonding between the cabinet and the top frame, as shown by (3) in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Air Conditioners
Figure
7-15.
82