FusionModule2000 Smart Modular Data Center
Installation Guide
3.
Step 3 Use a right angle to position the end cabinet base, and ensure that the outline of the upper
surface of the base aligns with the cabinet bottom outline on the floor.
Figure 4-6 Positioning the first base
Step 4 Use the end cabinet base as the reference and place other cabinet bases.
Step 5 Check that the installation position meets the requirements.
Step 6 Use a marker to mark hole positions.
Issue 02 (2018-03-31)
Figure 4-5 Assembling a base
Assemble the telescopic rod and the base, and then tighten the bolt assembly.