3.
Step 4 (Optional) Adjust the gap between door panels.
Issue 02 (2018-03-31)
Figure 10-42 Installing door panels
Secure each hinge on the side of the door post using two M4 screws.
Figure 10-43 Installing door panels
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Installing the Aisle Containment