Figure 10-39 Assembling a door frame
1.
2.
3.
Store the side plates you removed from the door frame.
Step 2 Install the door frame.
Issue 02 (2018-03-31)
Place the door posts and upper frame mounting kit on the floor, pull the post side plates
from the ends of the door posts, and remove the side plates, as shown by (1) and (2) in
Figure
10-39.
Assemble the door frame by connecting the two door posts and upper frame mounting kit
with six M6 screw assemblies, as shown by (3) in
After the assembly is complete, verify that the posts are flush with the upper frame
mounting kit.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Installing the Aisle Containment
Figure
10-39.
129

Advertisement

Table of Contents
loading

Table of Contents