Huawei FusionModule2000 Installation Manual page 95

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Figure 8-3 Securing the cabinet
Figure 8-4 Securing an air conditioner to the base
Issue 02 (2018-03-31)
For the 300 mm wide Arki type air conditioner:
Align the mounting holes on the front and rear of the air conditioner with those on the
top of the base and secure the air conditioner to the base using M10 screws in the fitting
bag.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Combining Cabinets
86

Advertisement

Table of Contents
loading

Table of Contents