Huawei FusionModule2000 Installation Manual page 158

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Preparations
Materials: labels
Procedure
Step 1 Take out cabinet labels from package 0.
Figure 10-62 Cabinet labels
Step 2 Attach a label to the dented imprint on the skylight connective plate.
Issue 02 (2018-03-31)
Ensure that labels are properly aligned.
If there is no dented imprint on the skylight connective plate, attach a label at the accurate position
shown in
Figure
10-63.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Installing the Aisle Containment
149