Checking Fittings; Installing An Indoor Unit; Installing Supports - Huawei NetCol8000-A Series User Manual

In-room air cooled smart cooling product
Hide thumbs Also See for NetCol8000-A Series:
Table of Contents

Advertisement

NetCol8000-A(050, 100) In-room Air Cooled Smart
Cooling Product
User Manual
Figure 3-14 Removing the bolts that secure the NetCol8000-A100 to the pallet
----End

3.3.2 Checking Fittings

Before installation, check that:

3.4 Installing an Indoor Unit

3.4.1 Installing Supports

Context
A support is optional for the NetCol8000-A. You can configure a support in the
following two ways:
Issue 12 (2020-10-28)
The cabinet exterior is in good condition and free from collision and scratch.
The cooling system has good air tightness. (Remove the bonnet from the
needle valve and press the valve plug to check whether there is a sound of air
flow. If there is no sound of air flow, please contact Huawei.)
The cabinet and its fittings including supports and assembly bolts comply with
the packing list.
Prepare the support according to the drawings obtained from Huawei.
Specify the support as a mandatory item for the NetCol8000-A in the
contract.
Copyright © Huawei Technologies Co., Ltd.
3 Installation Guide
42

Advertisement

Table of Contents
loading

Table of Contents