Removal procedure (cont'd)
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-27
Service Manual
Section 4-3-1
Section 4-3-2
Section 4-9-2
Section 4-3-4
Section 4-3-5
Section 10-5-2
8-2-26-4
Mounting Procedure
Install the new parts in the reverse order of removal.
8 - 66
3
Functional Tests
Section
Functional Test / Diagnostic Test
DTRX64II Assy Function Validation Procedure
System B/M-Mode Checks
System CFM and PWD Checks
Functional Checks (See Also Chapter 4)
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
Power On/Boot Up
Power Off / Shutdown
LOGIQ™ P6/P6 P
S
RO
ERVICE
Debrief Script
"Service Manual, Direction
5245279, Rev 3+, Section 8-2-26. Equipment
passed all required tests and is ready for use. "