8-2-39
Air Filter Set
8-2-39-1
Tools
No need tool
8-2-39-2
Preparations
Shut down the system and switch off the main breaker.
8-2-39-3
Removal procedure
1.) Pull out the 2 Air filters from the bottom left and right side of the trans box. Refer to the Figure 8-127.
2.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-40
Service Manual
Section 4-3-1
Section 4-3-2
Section 4-8-2
Section 10-5-5
8-2-39-4
Mounting Procedure
Install the new parts in the reverse order of removal.
3
Air filters
Figure 8-127 Air filters
Functional Tests
Section
Functional Test / Diagnostic Test
Air filter set Function Validation Procedure
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
View from the foot rest
Power On/Boot Up
Power Off / Shutdown
Physical Inspection
LOGIQ™ P6/P6 P
S
RO
ERVICE
Debrief Script
"Service Manual, Direction
5245279, Rev 3+, Section 8-2-39. Equipment
passed all required tests and is ready for use. "