Section 3-5

Completing the Installation

3-5-1

Power On/Boot Up

NOTE:
After turning off the system, wait at least ten seconds before turning it on again. The system
may not be able to boot if power is recycled too quickly.
3-5-1-1
Scanner Power On
1.) Connect the Main Power Cable at the rear of the System.
WARNING
WARNING
Protective earth must be taken when connecting AC power cable (200V) without its plug
to wall outlet.
2.) Connect the Main Power cable to an appropriate mains power outlet.
3.) Switch ON the Main Circuit Breaker at the rear of the System.
When power is applied to the Scanner, and the Rear Circuit breaker is turned ON, Power is distributed
to the DC Power supply unit and power control assy in the AC power assy. When the Power ON/OFF
key is pressed once, the DC power supply is enabled and feed each DC power to board assemblies.
and system run the software.
4.) Press the ON/OFF key at the front of the System once.
3
Figure 3-8 Circuit Breaker