GE LOGIQ P6 Service Manual page 401

Hide thumbs Also See for LOGIQ P6:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5245279, R
IRECTION
EVISION
8-7-7
BW printer Fixture Middle installation
1.) This section describes the installation procedure of BW printer fixture in the middle poisition.
2.) Install BW Printer on the top of the base bracket by screwing 4 screws. Refer to the Figure 8-290.
3.) Unscrew 2 existing screw from the middle cover.
4.) Place the BW printer with base bracket on the middle cover and screw 2 screws to fix it. Refer to
the Figure 8-291.
3
base bracket
Figure 8-290 BW Printer Fixture Middle installation
Figure 8-291 BW Printer Fixture Middle installation
Section 8-7 - Mechanical Option Installation instruction
LOGIQ™ P6/P6 P
S
RO
ERVICE
M
ANUAL
8 - 181

Advertisement

Table of Contents
loading

Table of Contents