Replacing Tlon Board And Main Board - Panasonic EBL512 G3 Operating Instructions Manual

Hide thumbs Also See for EBL512 G3:
Table of Contents

Advertisement

EBL512 G3 V. 3.0.X - FIRE ALARM SOLUTIONS OPERATING INSTRUCTIONS

38. REPLACING TLON BOARD AND MAIN BOARD

By the TLON network programming, some unique data will be stored in a memory on the 5090 TLON connection board and some
will be stored in a memory on the main board.
The main board 5012 is not compatible with the old TLON connection board 1590.
REPLACING ONLY A TLON CONNECTION BOARD 5090
After replacing the board:
In TLON Manager version 1.2 do "Replace", "Update" and "Save".
In TLON Manager version 2.0 do "Replace" and "Update" ("Save" is automatically done).
REPLACING BOTH A TLON CONNECTION BOARD 5090 AND ALSO THE MAIN BOARD
After replacing the boards:
In TLON Manager version 1.2 do "Replace", "Update" and "Save".
In TLON Manager version 2.0 do "Replace" and "Update" ("Save" is automatically done).
REPLACING ONLY THE MAIN BOARD
After replacing the main board, put back the TLON connection board(s) in the same position as on the replaced main board:
In TLON Manager version 1.2 do "Update" and "Save".
In TLON Manager version 2.0 do "Update" ("Save" is automatically done).
129

Advertisement

Table of Contents
loading

Table of Contents