600 Work equipment
Removal and installation of work equipment assembly
8.
Lift the work equipment assembly, remove
plate (9) and pin (10) at the foot.
q
In case to remove using tool V
Remove plate (9) and remove pin (10) at the
foot using tool V.
a Check the number as well as locations of the
shims used.
9.
Remove work equipment assembly (11).
4
Work equipment assembly:
3,450 kg (PC200/200LC-8M0)
4,450 kg (PC220/220LC-8M0)
PC200, 200LC, 220, 220LC-8M0
Installation
[*2]
q
Installation is done in the reverse order of
removal.
[*1]
2
Inside surface of bushing when assembling
pin: Molybdenum disulfide lubricant (LM-
P)
2
Greasing after assembling the pin:
k
When aligning the position of the pin hole,
never insert your fingers into the pin hole.
a st1: resin shim (thickness 1.0 mm)
a Adjust the clearance (b) between cylinder rod
(12) and plate (4) to 1.5 mm or less using
shims: 1.0 and 2.0 mm
[*2]
2
Inner surface of bushing as assembling the
pin: Anti-friction compound (LM-P)
2
Feed grease after assembling pin:
a Adjust the clearance (c) between the foot's end
face of boom (13) and bracket (14) to 1 mm or
less by use of shims. Thickness of standard
shim: 2.0, 2.5, 3.0 and 3.5 mm
SEN06147-00
Grease (LM-G)
Grease (LM-G)
3