Removal And Installation Of Final Drive Assembly - Komatsu PC200-8M0 Shop Manual

Table of Contents

Advertisement

SEN06144-00
Removal and installation of final
drive assembly
Removal
1.
Remove the sprocket, referring to the section
"Removal and installation of sprocket".
k
Completely lower the work equipment
to the ground and stop the engine.
Then loosen the oil filler cap for the
hydraulic tank to release the pressure
inside the tank.
k
Disconnect the cable from the negative
(–) terminal of the battery.
2.
Remove cover (1).
3.
Disconnect the travel speed selector hose (2),
the motor hoses (3) and (4), and the drain
hose (5).
2
50-300

Removal and installation of final drive assembly

a PC200-8M0, PC200LC-8M0
4.
Temporarily sling the final drive assembly (6).
1
5.
Remove 18 mounting bolts (7) and sling final
drive assembly (6) to remove it.
a Be careful so that the nipple sealing sur-
face on the hose mounting block may not
be damaged.
4
Final drive assembly: 300 kg
a PC220-8M0, PC220LC-8M0
6.
Temporarily sling the final drive assembly (8).
7.
Remove 18 mounting bolts and sling final drive
assembly (8) to remove it.
a Be careful so that the nipple sealing sur-
face on the hose mounting block may not
be damaged.
4
Final drive assembly: 350 kg
300 Power train
PC200, 200LC, 220, 220LC-8M0
[*1]
[*2]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8m0Pc220-8m0Pc220lc-8m0

Table of Contents