Komatsu PC200-8M0 Shop Manual page 1019

Table of Contents

Advertisement

300 Power train
Removal and installation of final drive assembly
Installation
q
Installation is done in the reverse order of
removal.
[*1]
3
Mounting bolts:
245 – 309 Nm {25 – 31.5 kgm}
[*2]
3
Mounting bolts:
265 – 309 Nm {27 – 31.5 kgm}
(Average torque: 275 Nm or more
q
Refilling with oil
Fill the power train oil (TO30) via the oil filler
port to the specified level. Start the engine to
circulate the oil through the pipings and
recheck the oil level.
q
Air bleeding
Refer to the "Bleeding air from each part" in the
Testing and adjusting chapter of this manual.
PC200, 200LC, 220, 220LC-8M0
{28 kgm or more})
SEN06144-00
3
50-300

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8m0Pc220-8m0Pc220lc-8m0

Table of Contents