SEN06144-00
15. Cover
1)
Using eyebolts [1], install cover (1)
4
Cover: 20 kg
2
Contacting face of cover and ring gear:
2)
Using tool J7, tighten the 18 mounting
bolts.
3
Mounting bolts:
First time: 98 Nm {10 kgm}
Sencond time: 80 – 90
16. Oil refill
Tighten drain plug and fill power train oil
(TO30) from the oil filler port.
5
Final drive case: Approx. 3.8 l
a Do a final check of the oil level at the
determined position after installing the
final drive assembly to the chassis.
12
50-300
Liquid gasket (LG-6)
° (rotating angle)
Disassembly and assembly of final drive assembly
PC200, 200LC, 220, 220LC-8M0
300 Power train