Komatsu PC200-8M0 Shop Manual page 1049

Table of Contents

Advertisement

300 Power train
Disassembly and assembly of swing motor and swing ma-
a PC220-8M0, PC220LC-8M0
q
Align the relation between the positions of
the motor port ((g) section) and convex
portion of the case ((d) section) as men-
tioned in the drawing and install them.((c),
(d): Above-mentioned)
13. Confirm mounting angle of elbow for drain (38):
15° and the tightening torque.
3
Elbow mounting nut:
128 – 186 Nm {13.0 – 19.0 kgm}
PC200, 200LC, 220, 220LC-8M0
14. Install the drain hose.
a As installing the hose, be careful that the
drain plug to be downward.
3
Drain hose:
128 – 186 Nm {13.0 – 19.0 kgm}
15. Oil refill
Fill the power train oil (TO30) from oil filler port
up to the standard level by tightening the drain
plug.
3
Drain plug:
19.6 – 24.5 Nm {2.0 – 2.5 kgm}
5
Swing machinery case
PC200, 200LC-8M0: 7.1 l
PC220, 220LC-8M0: 8.2 l
a Check oil level by using oil level gauge.
SEN06144-00
33
50-300

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8m0Pc220-8m0Pc220lc-8m0

Table of Contents