Komatsu PC200-8M0 Shop Manual page 1140

Table of Contents

Advertisement

SEN06148-01
24. Remove grommet (34).
25. Move wiring harness (35) to the outside of the
floor frame.
a (SP) is made of sponge.
26. Disconnect the clamp of wiring harness (35).
27. Move plates (36) and (37) together with wiring
harness (35) to the boom side.
28. Open the engine hood and remove cover (38).
29. Disconnect clamp (39).
30. Disconnect PPC hose (40) of the work equip-
ment. From the top, the color of the band is:
White
Brown
None
Blue
Black
24
50-700
700 Cab and its attachments
Removal and installation of floor frame assembly
Green
Red
Yellow
a Prepare an oil sump.
31. Pull out PPC hose assembly (41) of the work
equipment.
32. Sling floor frame assembly (42) and remove it.
a Make sure that the hoses, connectors,
clamps, and so on are disconnected with-
out fail.
4
Floor frame assembly: 250 kg
PC200, 200LC, 220, 220LC-8M0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc200lc-8m0Pc220-8m0Pc220lc-8m0

Table of Contents