SEN06143-00
Removal and installation of
aftercooler assembly
Removal
k
Park the machine on a level ground, lower
the work equipment to the ground stably,
and stop the engine.
k
Disconnect the cable from the negative (–)
terminal of the battery.
1.
Turn the upper structure by 90°.
2.
Remove cover (1).
3.
Open up the engine hood.
4.
Disconnect reservoir tank hose (2).
5.
Remove cover (3).
40
50-200
Removal and installation of aftercooler assembly
6.
Remove hose (4).
a MIKALOR clamp
1
a Mark the hose edge and tube to show the
original hose installation positions. (See
figure below.)
a Inserted air hose length: 80 mm
7.
Remove cover (5).
200 Engine and cooling system
PC200, 200LC, 220, 220LC-8M0
[*1]