Installation Guide; Installation Precautions - Huawei NetCol8000-E220 User Manual

Modular indirect evaporative cooling system
Hide thumbs Also See for NetCol8000-E220:
Table of Contents

Advertisement

NetCol8000-E220 Modular Indirect Evaporative Cooling
System
User Manual

3.1 Installation Precautions

Storage
Before installing the NetCol8000, place it in dry, rainproof, fireproof, and anticorrosive
environments.
Installation Clearances
Reserve the following clearances around the device to facilitate operations and ventilation:
Issue 02 (2019-10-10)
Place the NetCol8000 outdoors, and ensure that the NetCol8000 is protected from dirt,
rain, snow, other substances, or animals, and that the protective film on the surface of the
NetCol8000 is intact.
Do not expose the NetCol8000 to strong sunlight in summer. Otherwise, the thermal
insulation panels may be deformed.
If the NetCol8000 is packed with the entire system, do not stack them.
Check the NetCol8000 periodically.
Reserve at least 500 mm from the return air side to the wall.
Reserve at least 1500 mm from the maintenance doors side to the wall or other device.
Reserve at least 1200 mm from the electric control box side to the wall or other device.
Copyright © Huawei Technologies Co., Ltd.
3

Installation Guide

3 Installation Guide
18

Advertisement

Table of Contents
loading

Table of Contents