Huawei NetCol8000-E220 User Manual page 33

Modular indirect evaporative cooling system
Hide thumbs Also See for NetCol8000-E220:
Table of Contents

Advertisement

NetCol8000-E220 Modular Indirect Evaporative Cooling
System
User Manual
Stage
During hoisting
Table 3-6 Parameters for hoisting NetCol8000-Es
Weight
Net weight: 5700
kg
Tools: crane, marker, ink fountain, long leather measuring tape, socket wrench, torque wrench,
Phillips screwdriver, jack, steel hoisting rope, level, level gauge, hammer drill, angle rule,
claw hammer, vacuum cleaner
Materials: NetCol8000-E, expansion bolt, angle steel bracket
Procedure
Step 1 Prepare a concrete platform by referring to the following figures.
Issue 02 (2019-10-10)
Precautions
Do not allow any unauthorized people to enter the hazardous areas
and never stand under the crane arm during hoisting.
Ensure that the crane is properly located and avoid long-distance
hoisting.
Keep the device stable and horizontal during hoisting, and ensure
that the diagonal gradient of the NetCol8000-E is within 5 degrees.
Lift and land a NetCol8000-E slowly to prevent shock to equipment
inside it.
Remove the steel ropes after ensuring that the device is placed
evenly on the concrete platforms.
Steel Rope
Steel Rope
Length
Quantity
> 6.5 m
4 PCS
Copyright © Huawei Technologies Co., Ltd.
3 Installation Guide
Dimensions (H x W x D)
6058 mm x 2438 mm x 3600 mm
25