Epson C12 Series Manipulator Manual page 117

6-axis robots
Hide thumbs Also See for C12 Series:
Table of Contents

Advertisement

Installation
1. Install the spacers to the holes on the gasket.
2. Apply the liquid gasket to the base rear gasket.
NOTE
3. Install the connecter plate to the Manipulator.
NOTE
NOTE
4. Install the heat sink.
5. Install the fan.
C12 Rev.3
(11 places)
Install the base rear gasket to the base cover.
(See the figure for gasket applying points)
Gasket
Applying
point (×11)
After applying the liquid gasket, leave the gasket until the liquid gasket becomes
solid and the gasket is fixed.
Hexagon socket head cap bolts: 11-M4×10
Tightening torque: 4.0 ± 0.2 N·m
Be careful not to get the gasket and cables caught
between the cover and the Manipulator body.
Replace the gasket if there are flaws or deteriorations.
For cleanroom model, install the gasket between the heat
sink and the connector plate.
Hexagon socket head cap bolts: 4-M4×15
Tightening torque: 4.0 ± 0.2 N·m
For details, refer to Maintenance 15. Replacing the Fan.
Spacer (×11)
Base rear gasket
Base cover
Maintenance 3. Covers
103

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C12-a1401 seriesC12xl

Table of Contents