Epson C12 Series Manipulator Manual page 144

6-axis robots
Hide thumbs Also See for C12 Series:
Table of Contents

Advertisement

Maintenance 4. Cable Unit
42. Place a mark at a position 250 mm from the cable bracket (C2).
43. For the GS01 cable to be installed on the control board 1, place a
mark at a position 130 mm from the connector.
44. For the X021, X121, BR021, and CN3 cables, place a mark at a
position 160 mm from the connector respectively.
45. Use cable brackets (C1) to fix the cables to the Arm #1 cable fixing
plate temporarily (2 positions).
Temporarily fix the silicone tube by aligning its end to the mark.
Hexagon socket head cap bolts: 4-M3×6
Rough guide of temporary fixing:
The cables can be pushed up even after fixing the cables.
130
250 mm
C12 Rev.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C12-a1401 seriesC12xl

Table of Contents