Mounting In Flush-Mounted Installation Box In Solid Wall - ABB SmartTouch B/stainless Product Manual

Table of Contents

Advertisement

6.5.3

Mounting in flush-mounted installation box in solid wall

Installation on the basis of the instructions on the enclosed plastering template:
Notice
See mounting instructions on the enclosed plaster and drilling template.
First the bottom part of the flush-mounted installation box must be pulled off and
installed flush-mounted.
1
3
6
Fig. 8:
Mounting in solid wall
Installation on the basis of the instructions on the enclosed drilling template:
Continue with "Electrical connection" on page 40 and "Installation" on page 41.
Product manual 2CKA001473B5343
2
4
Connection, installation / mounting
5
│37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents