Problems With The Server - NEC Express5800 120Rj-2 User Manual

Hide thumbs Also See for Express5800 120Rj-2:
Table of Contents

Advertisement

User Guide
On-screen message
VBAT Alm XX
WDT timeout

Problems with the Server

Fail to power on the server:
Is the server is properly supplied with power?
- Check if the power cord is connected to a power outlet (or UPS) that meets the
power specifications for the server.
- Check the power cord for broken shield or bent plugs.
- Make sure the power breaker for the connected power outlet is on.
- If the power cord is plugged to a UPS, make sure the UPS is powered and it out-
puts power. See the manual that comes with the UPS for details.
Power supply to the server may be linked with the connected UPS using the
CMOS Setup utility of the server.
<Menu to check: [Advanced] - [AC-LINK]>
Did you press the POWER/SLEEP switch?
- Press the POWER/SLEEP switch on the front of the server to turn on the power
(the POWER/SLEEP lamp lights).
Fail to power off the server
■ Is the power switch enabled?
- Restart the server and start the BIOS setup utility
■ Is the server running in secure mode?
- The power switch is disabled in the Secure Mode (Forced shutdown is also not
available). To release the Secure Mode, enter the password specified with the
BIOS Setup utility.
No screen display appears and beep occurs.
Is the DIMM board installed securely?
- Check whether the DIMM board is inserted into the mating connector securely.
- Check whether DIMMs of different specifications are installed in the specific
bank.
Figure 188: BMC Messages (Lower Line)
Description
Voltage alarm in lithium battery occurred.
XX=09: high voltage (fetal)
XX=07: high voltage (warning)
XX=02: low voltage (warning)
XX=00: low voltage (fetal)
Watchdog timer timeout error occurred.
222
www.nec-computers.com

Advertisement

Table of Contents
loading

Table of Contents