Post Execution Flow - NEC Express5800 120Rj-2 User Manual

Hide thumbs Also See for Express5800 120Rj-2:
Table of Contents

Advertisement

User Guide
■ When the server is being used for the first time.
■ When the server appears to fail.
■ When the server beeps many times between power-on and OS start-up.
■ When an error message appears on the screen.
refer to subsection
Guide.
Always allow POST to complete before powering down your
system.
If you have problems powering on your system, refer to
page 212
.
After you have successfully powered on your system, insert the NEC ExpressBuilder
DVD-ROM into the optical disc drive, reboot the system and follow the screen prompts
to run NEC ExpressBuilder.

POST Execution Flow

The following describes the progress of POST in the chronological order.
Do not make key entries or perform mouse operations while
POST is in progress.
Some system configurations may display the message
"Press Any Key" to prompt a key entry. This message is
driven by BIOS of an installed optional board. Make sure to
read the manual that comes with the optional board before
any key entry.
Powering on the server, after you installed or removed an
optional PCI board or moved it to another slot, may display
the message that indicates incorrect board configuration and
suspend POST.
In such a case, press F1 to continue POST. Board configura-
tion can be made using the utility described later.
:
Note
For error messages that appear on the display unit,
"Error Messages" on page 200
Caution
Caution
55
www.nec-computers.com
in this
"Problem Solving" on

Advertisement

Table of Contents
loading

Table of Contents