Suzuki sq-416-420-625 Service Manual page 121

Table of Contents

Advertisement

1B-50 AIR CONDITIONING (OPTIONAL)
REMOVAL
1) Run engine at idle with A/C ON for 10 minutes.
2) Disconnect negative (–) cable at battery.
3) Recover refrigerant from refrigeration system using recovery
and recycling equipment.
NOTE:
The amount of compressor oil at removed must be mea-
sured and the same amount must be poured when installing
the compressor.
4) Disconnect thermal protector lead wire.
5) Disconnect suction and discharge hoses from compressor as-
sembly.
NOTE:
Cap open fitting immediately to keep moisture out of sys-
tem.
6) For G16 engine:
Remove compressor drive belt by loosening compressor as-
sembly mounting bolts.
For J20 engine:
Remove generator belt. Refer to Section 6H.
For H25 engine:
Remove compressor drive belt by loosening tension pulley bolt.
7) Remove compressor with magnet clutch assembly from its
mount.
8) If compressor assembly is replaced. Drain oil from compressor
assembly, and measure its amount.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents